More Filters
datedescriptioncondition
May 26, 2026 @ 8:25pm (America/Toronto)
May 26, 2026
mtb Great Idealview
May 9, 2026 @ 7:07am (America/Toronto)
May 9, 2026
mtb Idealview
May 1, 2026 @ 2:18pm (America/Toronto)
May 1, 2026
mtb Kudos to the trail fairies - amazing bridge work!! Variableview
Apr 21, 2026 @ 5:33pm (America/Toronto)
Apr 21, 2026
mtb The trail fairies have outdone themselves this time. The new bridge is a work of art Variableview
Apr 4, 2026 @ 10:34am (America/Toronto)
Apr 4, 2026
mtb Mud slide on first set of switchbacks. Trail between second and third switchbacks is gone. Large pile of mud covering little bridge between first and second switchbacks. Wetview
Nov 22, 2025 @ 9:11am (America/Toronto)
Nov 22, 2025
mtb Slick in places Variableview
Sep 27, 2025 @ 5:38pm (America/Toronto)
Sep 27, 2025
mtb Trails would be better on sunday for sure. Removed a fallen tree branch over hanging the trail near the start. Variableview
Sep 19, 2025 @ 8:17pm (America/Toronto)
Sep 19, 2025
mtb A ride-around is forming by the fallen tree at the first g-out. Dryview
Sep 5, 2025 @ 2:46pm
Sep 5, 2025
mtb Tree down right before the 1st g-out Unknownview
Aug 24, 2025 @ 2:09pm
Aug 24, 2025
mtb Idealview
Aug 17, 2025 @ 3:10pm
Aug 17, 2025
mtb Idealview
Jul 7, 2025 @ 11:15pm
Jul 7, 2025
mtb Both the take off and landing before the wall ride have been fixed thanks to the trail crew Dryview
Jun 25, 2025 @ 8:23pm
Jun 25, 2025
mtb Be careful on this landing before the wall ride, landed on this sharp concrete block edge and bended my rim Dryview
Jun 15, 2025 @ 4:10pm
Jun 15, 2025
mtb Some sections (wall ride and trail end) are getting pretty dry/dusty. Variableview
Jun 8, 2025 @ 4:05pm
Jun 8, 2025
mtb Trail is in great condition, overall. Some of the roots have become much more exposed since last year! Idealview
May 28, 2025 @ 10:26am
May 28, 2025
mtb Tree is full cleared now on RollerFlowster/FourPlay is now cleared of big tree logs. Trail is open! Idealview
May 7, 2025 @ 9:17am
May 7, 2025
mtb 2 areas where downed trees partially block the trail, rideable - but with caution. Variableview
Apr 30, 2025 @ 3:24pm
Apr 30, 2025
ebike another tree down, you can squeeze by but keep your eyes open Variableview
Apr 27, 2025 @ 3:45pm
Apr 27, 2025
mtb Cleared the large tree down with a hand chainsaw and moved the logs off the trail
Dryview
Apr 27, 2025 @ 1:01pm
Apr 27, 2025
mtb Dryview
Apr 26, 2025 @ 2:07pm
Apr 26, 2025
mtb Large tree down just after the 2 cement jumps. Dryview
Apr 13, 2025 @ 1:05pm
Apr 13, 2025
mtb Perfect Idealview
Apr 13, 2025 @ 11:27am
Apr 13, 2025
mtb Idealview
Apr 13, 2025 @ 10:17am
Apr 13, 2025
mtb Idealview
Mar 1, 2025 @ 11:27am
Mar 1, 2025
mtb End of RollerFlowster I have cleared another hanging dead fall tree. Access point is all clear. Also removed some knarly tree branches out of the way to prevent injuries. Trail is not rideable.
Icyview

Login to view work report summary